PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Excavation at Rahway Ave. Pic -2 (800x600).jpg Installing underground sanitary piping at Room 105 (Servery) Facing West (800x600).jpg Underground conduit for the Tele-Data at Rahway Ave. (800x600).jpg Building rebar column for Elev. 5,6 (4th Floor) Facing North-West (800x600).jpg Raised the slip forms at Elev. 4-Stair -2 (4th Floor) Facing South West (800x600).jpg
Previous page Raised the slip forms at Elev. 4-Stair -2 (4th Floor) Facing South West (800x600)
Raised the slip forms at Elev. 4-Stair -2 (4th Floor) Facing South West (800x600)